[SCHEDULER-1223]  Smarter Handling of Narrowband
Type Limitation
Priority Low
Severity Trivial
Component Dispatch Scheduler Engine
Fixed In Version [
Versions Affected [3.73.7
Severity Unassigned
Resolution Unresolved
Reported By Bob Denny
Resources
Start Date 1/1/0001

Description
This came up in this Comm Center thread by Dean Salman. He has HA plans that can be run with Moon and other plans RGB with Moon Down constraint. He is seeing the HA plans running (random choice) because they are eligible and that's crowding out the RGB plans which should be run in preference due to the Moon being down.

This is an interesting problem along the lines of the one for which Rising Plan Delay was created (different problem)> I'm looking for an elegant/general solution to this.

Comments
6/29/2020 12:08:33 PM   Bob Denny
This was brought up gain by Paul Gardner.