[SCHEDULER-243]  Plan mid-point calculation error
Type Bug
Priority Low
Severity Trivial
Component Dispatch Scheduler Engine
Fixed In Version [3.13.1
Versions Affected [3.0.1, 3.03.0 Hot Fix 1, 3.0
Severity Closed
Resolution Complete
Reported By Bob Denny
Resources Bob Denny
Start Date 10/23/2009

Description
For plans with only one Observation, the mid-point time is not being used, instead the starting time of the Observation is being used. Looking at the comments in the source, I don't understand what I was thinking...

Comments
10/23/2009 11:15:42 AM   Bob Denny
SVN Comment
Author rbdenny
Repository svn+ssh://rbdenny@a2_svn_dc3/home/rbdenny/svn/astro/scheduler
SVN Revision 38
Affected files /trunk/Scheduler/Engine.cs (Modified)
Check-in comment Fix logging of rise deferral, time span of single-obs plans. GEM:243 GEM:242