SCHEDULER-1118 - Schedule of panel/screen flats, have dome closed
Estimated: 12 Hours 0 Minutes   Logged: 12 Hours 30 Minutes   Excess Time: 0 Hours 30 Minutes
Print  |  Send  |  Refresh  |  Url
Type: Bug Bug
Priority: Medium Medium
Severity: Minor Minor
Status: Closed Closed
Resolution: Complete
Resources: Bob Denny
Reported By: Bob Denny
Component: Dispatch Scheduler Engine
Fixed In Version: 3.7
Versions Affected: 3.6c
Start Date: 8/1/2014
Percent Complete:
Created:  3/6/2014 6:29:30 PM
Revised:
 9/5/2014 10:39:42 AM
Closed:  9/5/2014 10:39:42 AM
Resolved:  9/5/2014 10:39:38 AM

It is not a good idea to have the panel/screen flats done at dawn/dusk, and in any case the dome/roof needs to be closed. This is not provided in the current logic. Somehow Scheduler needs to be aware of ACP being setup for Panel Flats. Should dawn and duck flats remain a concept with options? Could we assume there are no light leaks and do at dawn/dusk but with the roof closed. That might be the ticket. Or maybe right after the sun rises above the "sun down angle" in the morning? Dusk could mean "start at sundown" and run till complete? Or maybe no dusk at all.

Review the timing of dome/roof open/close and the options selected.